The following warnings occurred: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Warning [2] Undefined variable $awaitingusers - Line: 46 - File: global.php(816) : eval()'d code PHP 8.1.32 (Linux)
|
![]() |
AAR - Operation Red Devil - Printable Version +- Forums (http://snowvikings.com/Forum) +-- Forum: SNOW VIKINGS | ARMA 3 UNIT (http://snowvikings.com/Forum/forumdisplay.php?fid=5) +--- Forum: After Action Reports (http://snowvikings.com/Forum/forumdisplay.php?fid=10) +--- Thread: AAR - Operation Red Devil (/showthread.php?tid=72) |
AAR - Operation Red Devil - Fredwalk - 09-11-2017 Operation: Operation Red Devil In-Game time: Operation start 03:30, Operation end 04:25 Location: Malden Weather: Slightly cloudy with a small breeze. Objectives - Shutdown enemy communication site - Destroy enemy vehicle pool - Recover enemy intel Execution SOG team "Kilo 0-1" was put to the task this operation. Lead by their team leader LT. Walker, and joined by Light machinegunner Sgt. Guillet and UAV operator Sgt. Rydhal. They took out the Communication site and vehicle pool unnoticed. The explosion of their vehicles going boom drew their attention and they started searching for "Kilo 0-1". The team was split as Sgt. Guillet took position in the nearby mountain side. And provided suppressing fire for LT. Walker and Sgt. Rydhal. During the attack / defense Rydhal got hot bad in his chest, puncturing one of his lungs. After searching 3 different sites they were successful of recovering intel and escaped by boat. Operation Red Devil will continue as the intel collected had critical information. Notes No major events happen, and no medals / ribbons were dealt out in the result of this operation. |